Solar Farm Constructions completed approximately 30,000 piles on the Darlington Point Solar Farm for Nilsen Pty Ltd & EPC JV between Signal Energy Australia and Canadian Solar. The 333MW site utilised the ATI Duratrack system constructed on W6x9 foundation piles. We were also responsible for the installation of over 350 PCU Inverter foundation piles of 150 x 150mm profile installed to a depth of 4 metres.
Our team installed over 5757 sigma section piles at the Maryrorough Solar Farm in Pittsworth QLD. The 35MW utilised the Ideematec Tracking system. All piles were installed in cement stabilised sand and met strict tolerance criteria including less than 1 degree of twist and less than 0.7 degree plumb range.
We successfully completed 7500 piles (200x100x5m) on the Cohuna Solar Farm for EPC Tempo Ltd. The site is a 34MW solar farm utilising the Soltec tracking system.
Solar Farm Constructions has recently completed piling on the 134MWdc solar farm at Yarranlea, QLD under subcontract to Monford Group. The Archtech system was the first of its kind being installed in Australia consisting of 54,000 piles.
If you have an upcoming project that requires the expert services of Solar Farm Constructions, give us a call today. Alternatively, you can complete the online enquiry form and a member of our team will be in touch shortly.
Copyright © 2022 Solar Farm Constructions | Privacy Policy
Website by iseekplant.com.au
Get in touch for further information or an obligation free quote by filling out the online form below. You can also speak with a member of our friendly team now by calling 0407 341 795.